Today the heat wave hit Lewes, but that didn’t keep the crew from working on laying the floor joists for the second floor. We were watching the progress and were able to see a load of lumber being delivered which will be used for the sub-floor. The second floor should be framed this week!
Early morning work begins at 8 Sandpiper
The 38′ floor joists being lifted to the second floor
Uncle Rob and Charlie check out the lumber delivery from Sussex Lumber
Sussex Lumber comes to deliver a load of lumber to 8 Sandpiper
Charlie looks out the front door of 8 Sandpiper
View of side patio from the front bedroom
Like this:
Like Loading...