Paint and Trim Close to Completion with Sun Shining on Metal Roof


We are so thrilled with the way that the front of 8 Sandpiper is coming together.  If you look at the front of the house it looks like a beach cottage, but once you go inside you can see it is much more spacious, able to fit the whole family!  This week the metal roof was completed and the exterior trim and horizontal wood planks were placed on the front of the house.  The small sections of vertical siding in white were added on the second floor and work continues on the interior.

So far, one coat of primer and one coat of paint have been added to all of the interior walls and all of the interior doors have arrived and will be installed next week.  Next week the trim will also begin to be put in place around all of the windows and doors on the interior of the house.  We are scrambling to finalize all of our finishing selections such as hardwood flooring, carpet and tile but everything should be selected this weekend (hopefully)!  Our contractor said that all of the kitchen cabinets have arrived and are waiting in the warehouse to be installed so it won’t be long until everything starts coming together rather quickly on the inside of the house.  We are on-track to have construction complete by January 2014!