Before the snow storm hit the east coast this week we were able to stop in at 8 Sandpiper and check out the latest updates and as usual we have some photos to share. The bathrooms are the final pieces that need to be completed and they will be done within the next week or so hopefully if the weather cooperates. Each full bathroom will have a granite countertop and the work continues on the master bath shower stall.
In addition to the bathroom work, the fill dirt has been leveled in around the house and the gravel for the driveway has also been spread around. Everything is almost done, summer can’t come soon enough!