beach house


Finished Bathroom Photos with Mirrors Hung

We know it has been a while since our last post, and we are happy to report that our final closing has been scheduled for mid March.  We promise to post additional photos of the interior of 8 Sandpiper as soon as we get the furniture in!  The number one … Continue reading

2014-02-22 Master Bathroom at 8 Sandpiper Ct - Beach House Vacation Rental - Lewes, DE

New Kitchen Photos with Light Fixtures

The kitchen is almost complete, the light fixtures and all appliances have been placed and all of the electric has been activated.  The ceiling fans have also been hung and work is being completed on the custom master bathroom shower stall.  We are on track to have construction completed by … Continue reading

2014-02-08 - Kitchen at 8 Sandpiper Ct - Lewes, DE beach home

2014-01-25 Granite Kitchen Sink - 8 Sandpiper Ct - Lewes, DE - Cape Shores Vacation Rental

Granite Countertops Installed in Kitchen

Yesterday we took a trip to visit 8 Sandpiper and check on all of the interior finishes that are being completed.  The biggest item that was new this time was the granite countertops in the kitchen.  As we have mentioned previously, the color we chose was “fantasy brown” which has … Continue reading


8 Sandpiper is Live on VRBO!

We are happy to announce that 8 Sandpiper is listed on Vaction Rentals By Owner (VRBO) and is now accepting reservations for summer 2014.  Search for 8 Sandpiper by property #553823 or visit our direct listing page here: http://www.vrbo.com/553823. All of our peak and off-peak rental rates are also posted … Continue reading

Screen Shot VRBO - 8 Sandpiper Ct

2014-01-12 - Hallway Laundry - 8 Sandpiper Ct - Lewes, DE 19958

Appliances Make Their Way to 8 Sandpiper

We are getting closer and closer to completion and this week is no exception.  The stainless steel kitchen appliances have been brought in and are in place, and the washer and dryer have also been placed in the hallway closet.  All of the wooden vanities for underneath the sinks have … Continue reading


Decks Nearing Completion and Kitchen Cabinets Being Hung

Since the hardwood flooring has been laid on the second floor, the kitchen has moved full steam ahead and all of the cabinets are being hung and installed.  Also, a separate crew working on the deck railings has been busy at work and is almost finished.  Take a look at … Continue reading

2014-01-05 - Lower Deck at 8 Sandpiper Ct - Lewes, DE - Vacation Rental

2013-12-15 - Hinkley Freeport - 8 Sandpiper Ct - Lewes, DE 19958 - Cape Shores

Light Fixture Preview

We have finally selected all of the outdoor lanterns, chandeliers, sconces and ceiling fans for the inside of 8 Sandpiper so when the electrician is back to finish adding all of the switch plates he will also install all of the light fixtures too.  When choosing the lights we stuck … Continue reading


Hardwood Floors Laid & New Exterior Photos

We hope everyone is enjoying the holiday season with their families, we definitely are!  This past week we visited 8 Sandpiper to check on the progress of the hardwood floors which started to be installed.  The wood is hand-scraped with a white wash finish for a beachy, rustic feel – … Continue reading

2013-12-26 - 8 Sandpiper Ct Exterior Lewes, DE 19958

2013-11-14 - Street View - 8 Sandpiper Ct Cape Shores Lewes Delaware Vacation Rental

Paint and Trim Close to Completion with Sun Shining on Metal Roof

We are so thrilled with the way that the front of 8 Sandpiper is coming together.  If you look at the front of the house it looks like a beach cottage, but once you go inside you can see it is much more spacious, able to fit the whole family!  … Continue reading